Skip to main content

Politicians make promises on their stump — we watch and hold them accountable.

Help keep the record honest →Create an account
Bills/119th Congress · House

H.R. 5219

Introduced

Camden National Battlefield Park Study Act

Sponsor
RRalph Norman· South Carolina
Introduced
September 9, 2025
Policy area
Public Lands and Natural Resources
Latest action
Referred to the House Committee on Natural Resources.September 9, 2025
[Congressional Bills 119th Congress]
[From the U.S. Government Publishing Office]
[H.R. 5219 Introduced in House (IH)]

<DOC>

119th CONGRESS
1st Session
H. R. 5219

To require the Secretary of the Interior to conduct a special resource 
study to assess the suitability and feasibility of establishing the 
Camden Battlefield area in the State of South Carolina as a unit of the 
National Park System, and for other purposes.

_______________________________________________________________________

IN THE HOUSE OF REPRESENTATIVES

September 9, 2025

Mr. Norman introduced the following bill; which was referred to the 
Committee on Natural Resources

_______________________________________________________________________

A BILL

To require the Secretary of the Interior to conduct a special resource 
study to assess the suitability and feasibility of establishing the 
Camden Battlefield area in the State of South Carolina as a unit of the 
National Park System, and for other purposes.

Be it enacted by the Senate and House of Representatives of the 
United States of America in Congress assembled,

SECTION 1. SHORT TITLE.

This Act may be cited as the ``Camden National Battlefield Park 
Study Act''.

SEC. 2. CAMDEN BATTLEFIELD AREA STUDY.

(a) Definitions.--In this section:
(1) Secretary.--The term ``Secretary'' means the Secretary 
of the Interior.
(2) Study area.--The term ``Study Area'' means the 
following affiliated areas of the National Park System:
(A) The site of the Battle of Camden fought in 
South Carolina on August 16, 1780, and any other 
resources in the area that relate to the Revolutionary 
War.
(B) Historic Camden, South Carolina.
(b) Study Required.--
(1) In general.--The Secretary shall conduct a special 
resource study of the Study Area--
(A) to evaluate the national significance of the 
Study Area;
(B) to determine the suitability and feasibility of 
designating the Study Area as a unit of the National 
Park System, to be known as ``Camden National 
Battlefield Park'';
(C) to determine the methods and means for the 
protection and interpretation of the Study Area by the 
National Park Service, other entities of the Federal 
Government or State or local government, or private or 
nonprofit organizations;
(D) to determine the viability of a local 
partnership model for the management of the Study Area 
and the transferability of existing management 
structures; and
(E) to identify cost estimates for any Federal 
development, interpretation, operation, and maintenance 
of the Study Area.
(2) Consultation.--In conducting the study under paragraph 
(1), the Secretary shall consult with interested Federal 
agencies, State and local government entities, private and 
nonprofit organizations, and any other interested individuals.
(c) Applicable Law.--The study required under subsection (b) shall 
be conducted in accordance with section 100507 of title 54, United 
States Code.
(d) Report.--Not later than 3 years after the date on which funds 
are first made available to carry out the study required under 
subsection (b), the Secretary shall submit to the Committee on Energy 
and Natural Resources of the Senate and the Committee on Natural 
Resources of the House of Representatives a report containing--
(1) the results of the study; and
(2) any recommendations of the Secretary.
<all>

Plain-language analysis

Not yet analyzed.

A plain-language breakdown — including any hidden or off-intent provisions and whether the bill was fast-tracked — is generated separately and reviewed before publishing. It will appear here once ready. Until then, the verbatim text above and the official source are the record.

StumpWatch is live, and the record is still growing. Many promises and positions aren’t tracked yet, and some features are still in beta. Add a sourced promise and help keep the record honest.

Help keep the record honest →