Bills/119th Congress · House

H.R. 7214

Introduced

End PG&E Lobbying Act

Sponsor
DJosh Harder· California
Introduced
January 22, 2026
Policy area
Energy
Latest action
Referred to the House Committee on Energy and Commerce.January 22, 2026
[Congressional Bills 119th Congress]
[From the U.S. Government Publishing Office]
[H.R. 7214 Introduced in House (IH)]

<DOC>

119th CONGRESS
2d Session
H. R. 7214

To amend the Public Utility Regulatory Policies Act of 1978 to 
establish a Federal standard relating to a two-year lobbying ban.

_______________________________________________________________________

IN THE HOUSE OF REPRESENTATIVES

January 22, 2026

Mr. Harder of California introduced the following bill; which was 
referred to the Committee on Energy and Commerce

_______________________________________________________________________

A BILL

To amend the Public Utility Regulatory Policies Act of 1978 to 
establish a Federal standard relating to a two-year lobbying ban.

Be it enacted by the Senate and House of Representatives of the 
United States of America in Congress assembled,

SECTION 1. SHORT TITLE.

This Act may be cited as the ``End PG&E Lobbying Act''.

SEC. 2. CONSIDERATION OF STANDARD FOR TWO-YEAR LOBBYING BAN.

(a) In General.--Section 111(d) of the Public Utility Regulatory 
Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the 
end the following:
``(22) Two-year lobbying ban for former member of state 
regulatory authority.--A person who is a former member of a 
State regulatory authority may not, during the period of 2 
years beginning on the date on which such membership 
terminated--
``(A) appear, lobby, or practice before such State 
regulatory authority to--
``(i) influence a decision of, or action 
by, such State regulatory authority; or
``(ii) gain information from such State 
regulatory authority that is not generally 
available to the public; or
``(B) render services for compensation in relation 
to any case, proceeding, application, or other matter 
before such State regulatory authority.''.
(b) Conforming Amendments.--
(1) Obligations to consider and determine.--Section 112 of 
the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 
2622) is amended--
(A) in subsection (b), by adding at the end the 
following:
``(9)(A) Not later than 1 year after the date of enactment 
of this paragraph, each State regulatory authority (with 
respect to each electric utility for which the State has 
ratemaking authority) shall commence consideration under 
section 111, or set a hearing date for consideration, with 
respect to the standard established by paragraph (22) of 
section 111(d).
``(B) Not later than 2 years after the date of enactment of 
this paragraph, each State regulatory authority (with respect 
to each electric utility for which the State has ratemaking 
authority) shall complete the consideration and make the 
determination under section 111 with respect to the standard 
established by paragraph (22) of section 111(d).'';
(B) in subsection (c)--
(i) by striking ``subsection (b)(2)'' and 
inserting ``subsection (b)''; and
(ii) by inserting ``In the case of the 
standard established by paragraph (22) of 
section 111(d), the reference contained in this 
subsection to the date of enactment of this Act 
shall be deemed to be a reference to the date 
of enactment of that paragraph (22).'' after 
``paragraph (21).''; and
(C) by adding at the end the following:
``(i) Other Prior State Actions.--Subsections (b) and (c) shall not 
apply to the standard established by paragraph (22) of section 111(d) 
in the case of any electric utility in a State if, before the date of 
enactment of this subsection--
``(1) the State has implemented for the electric utility 
the standard (or a comparable standard);
``(2) the State regulatory authority for the State has 
conducted a proceeding to consider implementation of the 
standard (or a comparable standard) for the electric utility; 
or
``(3) the State legislature has voted on the implementation 
of the standard (or a comparable standard) for the electric 
utility during the 3-year period ending on that date of 
enactment.''.
(2) Prior and pending proceedings.--Section 124 of the 
Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2634) 
is amended by adding at the end the following: ``In the case of 
the standard established by paragraph (22) of section 111(d), 
the reference contained in this section to the date of 
enactment of this Act shall be deemed to be a reference to the 
date of enactment of that paragraph (22).''.
<all>

Plain-language analysis

Not yet analyzed.

A plain-language breakdown — including any hidden or off-intent provisions and whether the bill was fast-tracked — is generated separately and reviewed before publishing. It will appear here once ready. Until then, the verbatim text above and the official source are the record.