Skip to main content

Politicians make promises on their stump — we watch and hold them accountable.

Help keep the record honest →Create an account
Bills/119th Congress · House

H.R. 9339

Introduced

Affordable Innovation for the Grid Act

Sponsor
RDiana Harshbarger· Tennessee
Introduced
June 18, 2026
Policy area
Energy
Latest action
Forwarded by Subcommittee to Full Committee by Voice Vote.June 24, 2026

Plain-language analysis

Analysis withheld.

Withheld: this analysis was produced by a retired pipeline and carries no scoring version, so it was never bound to a measured model, prompt or weighting. Nothing we have measured applies to it.

We hold a draft analysis of this bill but are not publishing it. StumpWatch does not show an accusation it cannot say how often it gets right — a finding we have not measured is treated exactly like one that failed. The verbatim text below and the official source remain the record.

How we decide what to publish →
[Congressional Bills 119th Congress] [From the U.S. Government Publishing Office] [H.R. 9339 Introduced in House (IH)] <DOC> 119th CONGRESS 2d Session H. R. 9339 To require the Secretary of Energy to conduct an assessment on the use of artificial intelligence and high-performance computing technologies to enhance the bulk-power system, and for other purposes. _______________________________________________________________________ IN THE HOUSE OF REPRESENTATIVES June 18, 2026 Mrs. Harshbarger (for herself and Mr. Mullin) introduced the following bill; which was referred to the Committee on Energy and Commerce _______________________________________________________________________ A BILL To require the Secretary of Energy to conduct an assessment on the use of artificial intelligence and high-performance computing technologies to enhance the bulk-power system, and for other purposes. Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, SECTION 1. SHORT TITLE. This Act may be cited as the ``Affordable Innovation for the Grid Act''. SEC. 2. ASSESSMENT ON USE OF ARTIFICIAL INTELLIGENCE AND HIGH- PERFORMANCE COMPUTING TECHNOLOGIES TO ENHANCE BULK-POWER SYSTEM. (a) Assessment.--Not later than 90 days after the date of enactment of this Act, the Secretary of Energy, in consultation with the Federal Energy Regulatory Commission and the Electric Reliability Organization, shall conduct an assessment on the use of artificial intelligence and high-performance computing technologies, including an assessment of the employment of probabilistic operating techniques by artificial intelligence and high-performance computing technologies, to enhance the capacity, reliable operation, and operational efficiency of the bulk-power system. (b) Matters.--The assessment conducted under subsection (a) shall include an assessment of-- (1) the potential for artificial intelligence and high- performance computing technologies to expedite generator and load interconnection studies; (2) the current applications, and levels of adoption, of artificial intelligence and high-performance computing technologies with respect to the operation of the bulk-power system; and (3) any technical, regulatory, cybersecurity, or operational limitation affecting such adoption. (c) Report.--Not later than one year after the date of enactment of this Act, the Secretary of Energy shall submit to the Committee on Energy and Commerce of the House of Representatives and the Committee on Energy and Natural Resources of the Senate a report on the assessment conducted under subsection (a), including recommendations to-- (1) overcome any limitation assessed under subsection (b)(3); and (2) facilitate the adoption and integration of artificial intelligence and high-performance computing technologies with respect to the operation of the bulk-power system. (d) Definitions.--In this section, the terms ``bulk-power system'', ``Electric Reliability Organization'', and ``reliable operation'' have the meanings given those terms in section 215(a) of the Federal Power Act (16 U.S.C. 824o(a)). <all>

StumpWatch is live, and the record is still growing. Many promises and positions aren’t tracked yet, and some features are still in beta. Add a sourced promise and help keep the record honest.

Help keep the record honest →