Skip to main content

Politicians make promises on their stump — we watch and hold them accountable.

Help keep the record honest →Create an account
Fully KeptMississippi Infrastructure / Flood Control

Keep pushing federal agencies to finish the Yazoo Backwater Pumps flood-control project for the Mississippi South Delta.

Sources (click to view full provenance)

Propose an edit to this promise's details

Suggest a sourced correction to the promise text, topic, scope, significance, or dates. Changing the promise text requires a source. Your suggestion is reviewed before it changes the record.

Sign in and complete the Contributor Agreement to propose an edit.

Assessments

evidence-backed verdicts

These are sourced verdicts from fact-checkers or community evidence reviews — not opinions.

Fully KeptFact-checker reviewConfidence: 83%

All three cited sources are reachable and support the FULL outcome for this ongoing-effort promise ("keep pushing federal agencies to finish the Yazoo Backwater Pumps"). VERIFIED: (1) The Wicker Senate PRIMARY press release contains the load-bearing quote verbatim — "For decades, the government promised flood control solutions to the people of the South Delta. Today's announcement puts us one step closer to preventing further hardship, loss, and frustration in the region. It is time to finish the pumps." — documenting Wicker pressing agencies to complete the project. (2) WLBT confirms the Army Corps signed the Record of Decision on Jan 17, 2025, moving into "the pre-construction engineering and design phase, and the mitigation phase," documenting the agency advancement (Wicker appears only briefly via a Reeves tweet, consistent with how the rating uses this source — for agency progress, not Wicker leadership). (3) Magnolia Tribune confirms the final EIS (Dec 2, 2024) supporting the pumps and that Wicker's quote "It is time to finish the pumps" appears; the rating's surrounding descriptive framing is a light paraphrase not verbatim, but the load-bearing quote is genuine, not fabricated. After the promise date Wicker kept pushing and the federal agencies substantially advanced in the promised direction (final EIS → EPA acceptance → Record of Decision authorizing PED). FULL does not overstate: the rating conservatively chose FULL over CHAMPIONED (the sharper legislative driving is documented more for Hyde-Smith) and capped confidence because the pumps are not yet physically built — which was not the promised deliverable. Upheld.

Your opinion on this assessment(clearly labeled opinion)

Sign in to vote.

Discussion

community opinions

Comments are user opinions — not verdicts. They do not affect the official assessment.

Sign in to join the discussion.

Propose a correction

community accountability

See an error in the promise text, status, significance, or missing source? Submit a sourced correction — a reviewer will evaluate and apply it if accurate. Your submission must cite evidence; unsourced changes are not accepted.

Sign in or create an account to propose a correction.

Debate

sourced community arguments

These are sourced community arguments — not StumpWatch assessments. Each cites a source and is community-contributed; it does not change the official status or rating above.

No arguments yet

Be the first to weigh in. Every argument cites a source and is reviewed before it publishes. Create an account to add one and help keep this promise honest.

Add a sourced argument

Cite a source for your point. Submissions are held for reviewer approval before they appear.

Sign in or create an account to add an argument.

StumpWatch is live, and the record is still growing. Many promises and positions aren’t tracked yet, and some features are still in beta. Add a sourced promise and help keep the record honest.

Help keep the record honest →